Castro-SBU-amrex / 2018-09-28-001/

test input parameter file: ./Castro-SBU-amrex-tests.ini

combined build time for all tests: 42.4781000614 s

wall clock time for all tests: 203.661769867 s

Git update was done at: 2018-09-28 09:16:38 EDT

 

test namedimcompare plotfile# levelsMPI procsOMP threadsOpenACCdebugcompilerestartEOSNETWORKbuild timewall timeresult
flame_wave2
flame_wave_plt00025
2✓ (4)✓ (4)
helmholtz
aprox13
29.259 s82.551 sFAILED
hydrostatic_adjust1
hydrostatic_adjust_plt01457
1✓ (8)
helmholtz
general_null
13.219 s121.111 sPASSED